View Our Maps
Click to Home

Go To Search
RSSPrintEmail
Public Works
Upcoming Events
Stay Tuned!

Current Project Links
Downtown Improvement Plan
Yampa Street Improvements


About the Department
The streets we drive on, delivery of our drinking water, and drainage into our creeks and river are all managed by Public Works. The Department of Public Works has approximately 85 dedicated employees who maintain and protect existing public infrastructure in Steamboat Springs. Public Works also reviews proposals for new infrastructure during development and manages various capital projects. The department handles all snowplowing, sewer collection, waste water treatment, street reconstruction, and maintenance.

Divisions

Engineering
Steamboat Springs (Bob Adams) Airport
Streets/Fleet
Wastewater Treatment Plant
Utilities - Water & Sewer
Transit

Winter Reminders

Schedule your inspections now!
If you anticipate needing permanent power, a certificate of occupancy (CO) or water and/or sewer service during the winter months, schedule your project so that the grading and drainage improvements and utility installations are complete and inspected before November 1.  Don’t get caught by the snow!
  • To schedule a Right-of-Way Inspection call Thorne Clark at 970-846-9337. Please provide your name, site address and building permit number. Inspections are not conducted between November 1 and April 1 due to snow restricting visibility of site improvements.
  • To schedule a Water and/or Sewer Inspection call Public Works Utilities Division at 970-871-8211. No water and/or sewer work can be performed in the right-of-way from November 1 – May 1 without a variance.
  • To apply for an Excavation Permit (ROW permit) call Public Works Streets Division 970-879-1807.  In order to protect the City's infrastructure from damage over the winter months, excavation in the public right-of-way is prohibited from November 1 – May 1. You will need a variance approved by the Public Works Director if you must excavate in the right-of-way during snow season.
    Also don’t forget that all construction dumpsters, port-o-johns, material piles, etc. should be out of the right-of-way prior to November 1.

To avoid potential citation in the spring, make sure that all erosion and sediment control devices are installed and correctly functioning prior to snow fall.           


Jon Snyder
Public Works Director (Interim)
Email

P.O. Box 775088
137 10th St.
Steamboat Springs, CO 80477

Ph: (970) 871-8207
Fx: (970) 879-8851

Hours
Monday – Thursday
7:30 am- 5:30 pm

Staff Directory